Emergency Control room Telephone no.0522- 2722804, 2722807, 2722801, 8004940914, 800494017, VOIP Phone no.- 25220131, 25220133 Status of NOC from distribution & transmission licensee for Short Term Open Access can be monitored online Deviation Settlement Mechanism and related matters (Fifth Amendment Regulations), 2019 dated 28.05.2019 W.E.F. 3rd June, 2019

 

 

 

Frequency

UI Rate

Current Schedule Revision

Important Messages / Alerts

  • 1.  Bundelkhand, tehsil & nagar panchyat supply schedule for 01-07-2020 to 31-07-2020  
  • 2.  Tehsil and Nagar Panchayat Supply Schedule for 01-07-2020 to 31-07-2020  
  • 3.  Minutes of Coordination Meeting held on 10.06.2020.  
  • 4.  Format for tripping report to be sent to UPSLDC  
  • 5.  Railway Traction Supply  
  • 6.  UPSLDC (UPPTCL) GSTIN Details  
  • 7.  Generation report (MU) for the month of OCT-2020  
  • 8.  TTC ATC MAY-2020  
  • 9.  INDENT FOR SHUT DOWN: BLANK Format  
  • 10.  Outage Plan for LGBR FY ¿ 2021-22.  
  • 11.  MD UPPCL order regarding Exemption in Supply  
  • 12.  Grid Map of Uttar Pradesh  
  • 13.  DETAILS OF DISTRICT IN ALDS  
  • 14.  Intra State Transmission Charges And Losses (w.e.f.21-11-2020) For FY 2020-21  
  • 15.  Meeting notice and Agenda on various issues of Transmission system in UP Control Area.  
  • 16.  Merit Order Stack w.e.f. 16-11-2020  
  • 17.  TEHSIL HQ and NAGAR PANCHAYAT SUPPLY SCHEDULE w.e.f. 01-11-2020 to 30-11-2020  
  • 18.  RURAL SCHEDULE w.e.f. 01-11-2020 to 30-11-2020  
  • 19.  Bundelkhand Rural Supply w.e.f. 01.11.2020 to 30.11.2020  
  • 20.  Guidelines For Availing S/d of PSE  
  • 21.  Necessary Formalities to be Completed on Adding a New Element with the Grid  
  • 22.  Agricultural feeder supply schedule from 01-09-2020 to 30-09-2020.  
  • 23.  Morning Report_26112020  
  • 24.  Grid Report_26112020  
  • 25.  Daily Generation Outage Report 25-11-2020  
  • 26.  Daily Generation report (MU) 25-11-2020  
  • 27.  FORMATS FOR NEW ELEMENT CHARGING OLD  
  • 28.  FORMATS FOR NEW ELEMENT CHARGING NEW  

View All

Dynamic DataGraph

Demand Met (MW)
Schedule (MW))
Drawl (MW)
Deviation (MW)
Total SSGS (MW)
UPRVUNL Generation (MW)
Maximum Demand Met (MW)
Minimum Demand Met (MW)
Last Updated

Roles and Responsibilities

The UP State Load Dispatch Center is the apex body to ensure integrated operation of the power system in the State of UP. It is the strategic functional unit of Uttar Pradesh Power Transmission Corporation Ltd., for discharging various functions specified under Section 32 of Indian Electricity Act 2003. The main responsibilities of UPSLDC are:

  • To ensure the integrated operation of the power system in the Northern Region.
  • Monitoring of system parameters and system security.
  • Daily scheduling and operational planning.
  • Facilitating bilateral and inter-regional exchanges of power.
  • Analysis of tripping/disturbances and facilitating immediate remedial measures.
  • System studies,planning and contingency analysis.
  • Augmentation of telemetry, computing and communication facilities.
  • Computation of energy despatch and drawal values using SEMs.

Latest News

  • 1.  STU Connected Co generators/CPPs are directed to submit the banking agreements to Executive Engineer(Admin of EASS) A-106, UPSLDC Vibhuti Khand, Gomti Nagar ,Lucknow- 226010 earliest possible or latest by 31Oct-2020,for scheduling of banking power in accordance of UPERC(Captive and Renewable Energy Generating plants)Regulation,2019read more
  • 2.  Telephone Nos. of New SLDC Control Room 1. 08004940917 2. 08004940914 (Only for Official Use)read more
  • 3.  MRI data of interface meters should be uploaded through Remote Upload of EASS (www.eass.upsldc.org) and the intimation regarding the same should be sent to the official Email of SLDC Energy Accounting : seea[at]upsldc[dot]orgread more
  • 4.  UPSLDC is about to start scheduling and energy accounting of Solar and Wind Power Plants very soon. So, in first phase, all the existing solar and wind power plants have to pre-register at UPSLDC along with the required documents before the 10th September,2020 (this date is tentative and subject to changes). In second phase, QCA has to register along with the required documents by 20th September,2020 (this date is tentative and subject to changes).read more
  • 5.  All Solar/Co-gens/RE Generators are advised to fill their basic details on RE Gen. Info module in website on link "http://www.eass.upsldc.org/eass/REPreRegistration.jsp" so that SLDC can develop the schedule and Energy Accounting window for the RE Generators with appropriate consideration of basic connectivity details.read more
View All